Mago.net and the Labour Management


22 March 2013 by aubertini



TipsTrick 

ERP Manufacturing Team

There were three and a job to be done,

the strongest decided that he would direct the various stages of execution,

the smartest said he would monitor the success of the operation

and the weak had no alternative but to start.."

Charles William Brown

Locate the destination, draw the correct route and start the journey at times may not be sufficient to reach the goal and the good captain knows the importance of control, and if necessary correct, the route during navigation

The organization of team activities and the achivement of the maximum performance from activities carried out by resources is a fundamental result for the expected quality and customer satisfaction. The calculation of the labour cost and the comparison of the actual and the estimated costs allow you to assess more effectively the processing cost and correct any faults.

 

Perhaps not everyone knows that...

 

Mago net now provides a better management of labour costs in a way that allows to assign (with the relative times) different resources, teams or workers, to the single operation, both with regard to the setup and for processing and this ... for both the estimate that the actual!

Now it is  possible to assign a list of Teams and / or individual worker that are expected to have to operate as labour of processing and setup .

During the MO confirmation (final or partial) will be able to confirm and / or edit data for each resource, these data will be stored and used to calculate the final balance on the labour cost.

Therefore, all the masks were adjusted where labour is present (for example, the BOM, the variations and the Order of Production) and all the procedures involved in the input or update (eg the MO confirmation, the Processings Rollback or the Edit processings).  

Regarding to the  labour commitments, they can be expressed in Percentage of the duration of the operation, or you can specify a Fixed time, that is independent of the timing of the operation.

To enable such management it was created a new tab where you can detail the Workers and the Teams that are committed in the operations with their timing. 

So the operation master data was changed with the creation of the labour tab containing a detailed list of Workers and Teams committed to the operation, moreover, for each row, you can specify theresource type (team or Serial number), the labour type (processing or setup) and the number of workers. 

Of course in all the windows, which provide for the input or display of the workforce, it has been added a new icon that allows you to invoke this new labour Detail window.

Such information is critical for determining the labour cost and as described above, they are suggested based on the present Labour tab in the operation master data. It is also possible to change what it is proposed in this window, delete a row and / or add a row.

    

Regarding this topic you can ask for details to your reseller referral, or visit our on-line Microarea Help & Information Center.







MO Confirmation procedure enhancement: multiple Lots.


3 November 2010 by dsalvatore


MRP e depositi 

by ERP Manufacturing Team

The "lot": just a National Italian lottery for many people ...
... an essential information for us.

In almost every manufacturing company, the traceability of components represents one of the crucial feature of the entire manufacturing process.
The increasingly demanding standards of quality and management control are ensured not only thanks to knowledge of the origin of materials used in the various manufacturing process, but also thank to the spreading of this information in the semi-finished  product  re-used  in them and in the finished product sold.

That is why the lot number and its traceability, that Mago.net manages in an integrated and complete manner across production, logistics and accounting modules, can be considered both as origin and destination point of the entire manufacturing process.

but... perhaps not everyone knows that...


It is now also possible to define a desired number of shifts within the same working day and, during the execution of confirmation procedure directly in relation to them and to a single manufacturing order, to generate different lots of semi-finished or finished products.

Learn and discover how these lots are automatically organized into hierarchies, and how to trace their history from a single "father" linked to the manufacturing  order itself. This new functionality is available starting from the 3.1 release of Mago.net Professional edition.

Please keep in mind that you can update your Mago.net only if you have subscribed the M.L.U service and that regarding this topic you can ask for details to your reseller referral, or visit our on-line Microarea Help & Information Center and its FAQ, Samples & Tutorials section





Come back to the original ... the comparison between Bill of Material and Manufacturing Order


2 March 2010 by dsalvatore


MRP e depositi 

by ERP Manufacturing Team

Sometimes the first response is what counts!

It's trivial to say that little and continuous changes to the Bill of Materials, in most of existing production realities of a company, represent frequently recurring activities.

In reply to these needs Mago.net does not stop in the guarantee of complete freedom of action in the design and modification of them, but ensures modularity and scalability of solutions along the entire development of production process and beyond.

If it is easy to think that it is possible to modify in any moment the single desired component of a single desired Manufacturing Order in terms of presence or quantity of it, it could be not simple to remember the original structure of the originating Bill of Material.

Well, as usual, no problem! Simply saying that.....

Perhaps not everyone knows that....

The BOM/MO Comparison procedure of manufacturing module can highlight all differences between components contained in the given Manufacturing Order and the linked Bill of Material.

Through it you can easily define the set of initial analysis, highlight the desired differences, and automatically realign each Manufacturing Order to the original Bill of Material.

To know in detail the potential of the functionality, please contact your dealer reference and in addition if you are a M.L.U. subscriber, go to our site and follow the course NON EXISTING PAGEMago.net - Subcontracting (Advanced Manufacturing).